This representative apartment vanity handover case shows how LAMOO's product, drawing and production support worked within a distributor-led residential project.
The project covered 96 apartments, with 750mm, 900mm and 1200mm wall-hung vanity configurations. The first 12 apartments were used as a sample batch before the remaining production followed. The main risks were not cabinet fronts or finishes. They appeared where the vanity, drainage, water valves, electrical supply and mirror lighting met the apartment wall.

Project Overview
| Project information | Details |
|---|---|
| Location | Scandinavia |
| Project type | New multifamily residential development |
| Scale | 96 apartments |
| Room types | Studio, one-bedroom and two-bedroom layouts |
| Vanity sizes | 750mm, 900mm and 1200mm wall-hung units |
| Product package | Vanities, coordinated basins and mirror units |
| Main services | Waste drain, hot and cold water, mirror-lighting power and wall fixing |
| First sample batch | 12 apartments delivered for site trial before the full rollout |
| Supply scope | OEM/ODM production, drawing and service-point review, cut-out coordination, sample-batch support, labels and production records |
Why the Sample Batch Mattered
The first 12 apartments provided a practical way to test the complete wall condition before the same package was repeated across the development. LAMOO reviewed the approved room-type drawings and the evidence assembled from the sample rooms. The units looked consistent from the doorway: panels were level, finishes matched and the mirrors were symmetrical.
The joint review then exposed three repeatable interface risks:
- The waste outlet in one room type did not align with the centre of the basin waste.
- The trap assembly reduced clearance behind a drawer.
- The mirror supply point on two layouts sat outside the preferred terminal-housing zone.
Each issue could be handled in one room. Across dozens of apartments, the same 45mm offset or misplaced electrical point could create project-wide rework. The sample batch therefore became a shared reference for confirming the wall condition before the remaining room types were released.
Issue 1: A Drainage Conflict Resolved Before It Repeated
The approved drawings showed the drain centred beneath the basin. Site measurements collected by the distributor and contractor showed variations of roughly 35–65mm between room types. Some bathrooms had already been boarded, so moving the installed drain would have disrupted finished work.
The vanity used a structured rear service zone and designed drawer clearances, not an open frame. Ignoring the offset could have led to cutting a drawer on site, shifting the cabinet away from the basin axis or compressing the waste connection.
How LAMOO Resolved the Drainage Interface
- The project team consolidated room-type measurements for drain centre, water outlets and finished floor level.
- LAMOO overlaid those measurements on the approved vanity section and mirror elevation.
- LAMOO revised the rear cut-outs and one drawer-back configuration for the affected room type.
- The revised drawing identified a clear service zone behind the vanity.
- The project team confirmed the site condition in the sample batch before the change entered series production.
The checked site information was translated into a controlled manufacturing detail before it entered series production.

Issue 2: Aligning the Vanity With the MEP Set-out
The contractor issued mechanical, electrical and plumbing drawings for the bathroom, while the vanity and mirror package followed a separate approval set. Both sets looked reasonable on their own. The coordination risk appeared when they were compared at the wall:
- Water valves sat close to a drawer runner.
- One socket sat behind a structural part of the cabinet.
- The mirror cable entry was 90mm below the housing.
- No drawing clearly recorded who would finalise the flexible cable route.
LAMOO prepared a wall set-out review. It brought the finished floor level, drain centreline, hot and cold water centres, isolating-valve height, socket position, mirror centreline, cable entry and fixing-rail location onto one room-type sheet. The sheet was returned to the project team for confirmation with the sample vanity and mirror in their final positions.
For remaining production, any change to one of those dimensions triggered a re-check of the complete wall template. That gave the project team a traceable way to distinguish a confirmed design change from an unverified site request.
Issue 3: A Clearer Wet-Test Checkpoint
In the earliest rooms, the basin connection was tested after the top was in place and final sealing had begun. A small waste-joint seep appeared only when the first room was presented for handover. The contractor corrected the installation joint. LAMOO then prepared a recommended wet-test checkpoint for use during the sample-batch review.
- Connect the tap and waste using the approved installation method.
- Run hot and cold water and test the overflow and drainage.
- Inspect the waste connection, accessible trap and surrounding cabinet area.
- Operate every drawer and door after the water test.
- Record the result by room and room type.
- Complete final seals and cosmetic close-out only after the wet test passes.
The contractor remained responsible for installation, pressure testing and final acceptance. This created a consistent handover checkpoint for the local project process without shifting site responsibility to the factory.
How the Remaining Apartments Were Controlled
| Project need | Project responsibility | LAMOO factory support |
|---|---|---|
| Sample-batch approval | Coordinate the site trial and confirm the approved outcome | Review room-type drawings and production impact |
| Drawing changes | Own the approval record and customer communication | Issue the revised production detail and change reference |
| Wall set-out | Collect and confirm project dimensions | Compare measured conditions with the product section |
| Room allocation | Maintain the delivery plan for each apartment type | Apply required carton labels and packaging sequence |
| Quality assurance | Review the records before release to the project | Check against the approved sample and production reference |
| Open technical queries | Manage the project communication path | Provide a clear factory response for the project team to issue |
Factory Support for Repeatable Projects
LAMOO is an OEM/ODM bathroom furniture manufacturer with a factory-backed project process. Support for comparable projects can cover:
- Drawing and specification review: compare room-type drawings, vanity sections and service-point requirements before production;
- OEM/ODM production: manufacture to the approved size, finish, basin, mirror and hardware configuration;
- Sample-batch support: review the first installation pattern before the wider rollout is released;
- Production control: internal inspection and pre-shipment checks against the approved reference;
- Project traceability: room-type labels, packing lists and batch records that support staged delivery;
- Export coordination: packing information and shipping documentation for the agreed trade terms.
Separating an Interface Issue From a Product Issue
| Finding | First check | How LAMOO supports the response |
|---|---|---|
| Drain centre outside the approved cut-out | Installed position against the approved room-type dimension | Review whether a service-zone or cut-out change is technically suitable |
| Valve or socket obstructed by the cabinet | MEP set-out against the approved wall sheet | Compare the product section with the confirmed service positions |
| Door or drawer rubs after installation | Level, wall condition and installation adjustment | Review the installation evidence before releasing a replacement part |
| Wrong finish or size in the room | Carton label and room schedule | Trace the package batch against the production and packing record |
| Mirror does not operate | Wiring, driver, switch and mirror component | Provide component information and a structured fault-check path |
| Leak at basin waste | Installation joint, seal and component | Review product details after the connection has been tested systematically |
This process keeps the response focused on evidence. The project team can resolve an unverified site condition, while LAMOO can review a genuine production question instead of changing a correct product because a valve or drain has moved on site.
What to Send Before a Project Quote
For an apartment, hotel or other repeatable project, useful information includes:
- room-type schedule and quantities by apartment type;
- dimensioned vanity elevations and sections;
- drain centre, trap envelope, water outlets, finished floor level and service-point heights;
- socket, switch, mirror-cable and isolating-valve positions;
- wall construction, fixing condition, basin, tap, mirror and storage requirements;
- target market, preferred finish range, packing logic and required project documents.
LAMOO can then review manufacturability, identify drawings that need clarification and outline the factory support available before a project quotation is committed. For the next stage, the European apartment and hotel specification checklist provides an additional specification check.
Frequently Asked Questions
How early should LAMOO join an apartment project?
The most useful point is before MEP positions, wall construction and the product package are frozen. LAMOO can then review the factory implications before a small drawing issue is copied across the project.
Can the same product package be adapted to several room types?
Yes, provided the room-type differences are documented. Service-point positions, basin and mirror configuration, drawer clearance, labels and packing sequence should be approved before series production.
Who should resolve a drain-position conflict?
The project team should first confirm the installed site condition. LAMOO can then review whether a rear cut-out, service channel or drawer-back adjustment is technically possible without changing the approved product undesirably.
Can a LAMOO project review guarantee zero defects?
No. A useful review makes interface questions visible early and keeps product and site responsibilities clear. Installation and final acceptance remain part of the project process.
Planning an apartment or hotel rollout? Share the room types, quantities, drawings, target finish and expected delivery schedule. LAMOO will identify the production questions that need answers before the project is quoted.
Planning an apartment or hotel vanity rollout?
Share the room types, quantities, target finish, destination market and any drawings or service-point requirements. LAMOO can then review the project scope and the factory details needed for a useful quotation.